Main Service
Air Source Heat Pumps
Professional air source heat pump installation delivering efficient, low-carbon heating and reliable year-round performance solutions.
Air source heat pumps in Hertfordshire should feel like heating systems designed for their buildings, not products attached to them. Older centres, commuter homes, high-quality renovations, apartments and recent developments can differ in heat loss, pipework, emitters, hot-water space and acceptable outdoor positions.
Green Energy Homes assesses those elements together. Our air source heat pump service guide explains the fundamentals; this regional page helps property owners understand what a credible Hertfordshire proposal should resolve.

The design starts with room-by-room heat loss rather than an existing boiler size. Construction, glazing, insulation, extensions, airtightness assumptions and required temperatures are recorded. That evidence allows fabric improvements to be considered proportionately and gives the customer a clear reason for the selected capacity.
Radiators and floor-heating circuits are checked at the proposed water temperature. Some can remain, some may need increasing and a difficult room may benefit from a different emitter or fabric measure. Reviewing pipes, pumps and system volume at the same time avoids a design that looks adequate on a radiator schedule but cannot circulate correctly.
Cylinder location, indoor equipment and routes between the outdoor unit and heating system should be agreed before work begins. In a carefully refurbished house, this can prevent avoidable boxing or loss of storage. In a flat or managed building, ownership and access may rule out routes that appear straightforward on a plan.
The preferred position must provide airflow, drainage and service access while satisfying sound and planning requirements. Close boundaries, bedroom windows, reflective walls and screening proposals need practical review. Planting can soften views but must not grow into the clearances or make maintenance impossible.
A useful quotation separates equipment, hot-water work, emitter changes, electrical work, controls and any building work. Current BUS support is applied only after eligibility is checked through the installer-led route. The proposal should also explain commissioning, settings and what the customer needs to do before, during and after installation. Read the grant overview for current details.
Main Service
Professional air source heat pump installation delivering efficient, low-carbon heating and reliable year-round performance solutions.
Historic centres, commuter housing, apartments and modern family developments place different demands on a heat-pump project. External positions may need careful visual and acoustic consideration; managed buildings can require consent; renovations can offer opportunities for emitter, route and fabric coordination.
These factors are assessed at the individual property. Continue through the relevant Hertfordshire town page, then use the survey to establish the design temperatures, equipment positions and defined installation scope.
Yes, where the heat-loss calculation, emitters, pipework, hot-water design and outdoor location work together. Renovation can create opportunities to improve fabric and routes, but recently finished surfaces also make early coordination more important.
No. Required changes depend on each room’s heat loss and the output of its existing emitter at the design temperature. Some radiators may already be suitable. The result should come from calculation, not a rule that everything stays or everything changes.
Only if the screen preserves the manufacturer’s airflow and service clearances and does not worsen recirculation or sound. The visual solution should be considered with access, drainage and planning. A tightly enclosed unit can perform poorly even if it is less visible.
Alternative internal positions and cylinder sizes can be explored, but hot-water demand and service access cannot be ignored. Space constraints may affect the overall feasibility or require associated layout work, which should be identified before the customer commits.
The electrical design depends on the selected equipment, existing consumer unit, cable route and other loads. The survey should identify required protective devices and any network process. Assumptions about available capacity need confirming rather than being left until installation day.
The proposal should state the design assumptions, flow temperature and controls and avoid guaranteeing a universal bill saving. Weather, tariffs, temperatures and household use affect consumption. Correct commissioning and customer understanding are therefore part of the performance plan.



Tell us about the property, current emitters, hot-water routine and renovation plans. We can establish the checks needed and explain the survey and funding route.