Main Service
Air Source Heat Pumps
Professional air source heat pump installation delivering efficient, low-carbon heating and reliable year-round performance solutions.
Air source heat pumps in Kent can suit a wide range of properties, but the county label does not establish the design. Commuter homes, period buildings, later extensions, rural-edge properties and managed developments differ in heat loss, emitters, hot-water space, electricity supply and acceptable outdoor positions.
Green Energy Homes creates survey-led proposals for suitable installations. Our main heat-pump service page covers operation and the wider process; this Kent guide focuses on the choices that must be resolved before a system can be confidently specified.

Kent properties can combine original walls, later extensions, roof conversions and replacement glazing, making a single age-based assumption unreliable. Room-by-room heat loss identifies the actual requirement and helps distinguish useful fabric improvements from work that would not materially change the design.
Radiator and underfloor-heating output is assessed at the proposed water temperature. The proposal should identify what stays, what changes and why, together with any pipework or circulation work. This makes disruption and cost visible and avoids treating the heat pump as separate from the system delivering heat into each room.
Cylinder capacity and recovery are chosen for the household, while the location of indoor components and routes to the heating system are agreed around usable space. In a carefully finished or character property, early planning can prevent avoidable loss of storage and intrusive pipe boxing.
Airflow, maintenance, drainage and a secure base come first. Sound at neighbouring windows, visual impact, coastal exposure where relevant, landscaping and pipe length also matter. Listed buildings, conservation areas, flats and restricted development rights can require a different planning or consent route.
BUS support can reduce the cost of an eligible heat-pump installation, including temporary enhanced support for certain qualifying off-gas-grid replacements. Eligibility is verified separately from technical design. The final scope should cover electrical work, any network steps, controls, commissioning and a useful handover. See the current grant guide for details.
Main Service
Professional air source heat pump installation delivering efficient, low-carbon heating and reliable year-round performance solutions.
Kent includes established commuter communities, character buildings, rural-edge homes, managed properties and coastal or estuary settings. Their relevant differences lie in construction, existing fuel, plant space, access, neighbour relationships and exposure—not in a generic county specification.
Sevenoaks is the first dedicated Kent town guide in this rollout. Customers elsewhere can still provide their postcode for coverage checks, while every final recommendation remains based on the measured property and site.
It may. Suitability depends on calculated heat loss, emitters, pipework, hot-water demand, electrical provision and a compliant outdoor position. Older construction requires evidence and sometimes targeted changes; it does not produce an automatic yes or no.
Yes, if both emitter types are designed and controlled as one system. Their required temperatures, flows and room outputs must be checked. Existing underfloor circuits should be assessed rather than assumed to be suitable.
Not automatically, but equipment position, appearance and permitted-development conditions need careful review, and other restrictions may apply. Listed buildings and shared ownership bring additional consent questions. The final position should not be promised before those checks.
It can influence siting, component suitability and maintenance at genuinely exposed properties. The installer should follow manufacturer requirements and assess the actual site. A coastal postcode alone is not enough to impose a special specification on every project.
The installer checks the current Boiler Upgrade Scheme conditions, eligible technology, existing heating and property requirements and manages the application. Funding should be confirmed before it is treated as part of the final price.
Building heat loss, required indoor temperatures, hot-water use, flow temperature, weather, electricity tariff and controls all affect consumption. A responsible proposal explains assumptions and system design rather than promising one universal saving.



Share the address, existing heating, hot-water routine and any renovation plans. We can confirm the survey requirements, review possible outdoor positions and explain the current grant route.